Belcom Cables' new 136.89 kW solar installation delivers exceptional energy efficiency, generating 133,331 kWh annually with 234 high-performance panels. This system offers estimated annual electricity savings of £20,816, with a rapid payback period of 3 years, 10 months. Over its lifetime, it avoids 33.8 tonnes of CO₂ emissions per year, equating to planting 6,489 trees or avoiding 722 long-haul flights. With a net savings projection of £542,136, this investment solidifies Belcom Cables' commitment to sustainability and energy cost optimisation.
Greg Brennanuk aimed to reduce his energy costs and increase his home’s energy efficiency. B Solar Energy installed an 11.7 kW solar system with 20 x 585W panels and a 10kW FoxESS hybrid inverter, paired with 23.3 kWh of battery storage. The system is projected to generate 11,080 kWh annually, covering a substantial portion of Greg's estimated energy consumption of 6,500 kWh per year.
Richard Heighton approached B Solar Energy to reduce his energy costs and increase self-sufficiency. We installed a 29.76 kW solar PV system with 48 x 620W Aiko Energy panels and a 20 kW SolaX hybrid inverter. The system includes 41.76 kWh of SolaX battery storage, enabling Richard to maximise solar consumption and reduce reliance on grid energy. The system is expected to generate approximately 24,785 kWh annually, exceeding Richard's estimated consumption of 18,000 kWh per year.
A Customer approached B Solar Energy to install a solar PV system for their property in Henham. After a thorough assessment, we recommended a 41.36 kW system comprising 94 x 440W Hengdian Group DMEGC Magnetics panels paired with a 40kW SolaX inverter. This system is designed to generate an estimated 40,327 kWh annually, significantly offsetting Ben's electricity consumption, which is estimated at 30,000 kWh per year. As a result, Ben will be able to cover his annual electricity usage and generate surplus energy, allowing him to sell back to the grid through the Smart Export Guarantee (SEG).
This customer approached B Solar Energy to implement a solar energy system for their property. The recommended system features 26 x 450W Hengdian Group DMEGC Magnetics panels and a FoxESS hybrid inverter with 32.61 kWh of battery storage. This installation is expected to generate approximately 11,137 kWh annually, covering a significant portion of their energy consumption, estimated at 45,306 kWh per year. The integration of a FoxESS battery storage system allows Kumar to increase energy self-sufficiency and reduce reliance on the grid, even during low sunlight hours.
K J Hill LTD wanted to reduce his energy costs and become more energy independent. B Solar Energy proposed and installed an 18.135 kW solar system featuring 31 x 585W Hengdian Group DMEGC Magnetics panels and a Fox ESS 12 kW inverter. The system is expected to generate 14,910 kWh annually, which exceeds his estimated annual electricity consumption of 6,000 kWh.
Langthorns plantery sought a sustainable solution to reduce their energy costs and increase energy independence. B Solar Energy installed a 24.525 kW solar system with 45 x 545W panels and a SolaX Power 25kW inverter, paired with 49.2 Alpha Ess Batteries. This system is expected to generate approximately 23,961 kWh annually, covering most of their electricity consumption. They are on track to save £184,611.